Details to pay attention to when installing PPR pipes and fittings
Release time:
2025-02-25
PPR pipes and fittings on the market are divided into household and commercial use, with different uses such as hot water pipes, cold water pipes, and drain pipes.
PPR pipes and fittings on the market are divided into home decoration and construction, with different uses such as hot water pipes, cold water pipes, and drain pipes. Modern home decoration still mainly uses PPR pipes and fittings. It should be noted that professional PPR pipe and fittings manufacturers or construction teams must install them properly during installation, otherwise, the functions of the equipment cannot be achieved, materials are wasted, and it is inconvenient to use. PPR pipe and fittings manufacturers introduce the details that need attention during the installation of PPR pipes and fittings.
1.Pipelines should be concealed within the floor and installed according to the planned drawings. If there are any changes in on-site construction, they should be recorded with diagrams.
2.When pipes are pre-embedded and concealed in the wall, it is advisable to cooperate with civil engineering to leave a groove at the top, the scale plan is arbitrary and punctual. The depth and width of the pre-embedded pipe groove are De+20mm and De+40~60mm respectively. The groove needs to have a smooth appearance, without sharp corners or other protrusions. After the pipe pressure test is qualified, the wall groove is filled with M7.5 cement mortar.
3.Indoor floor pipe installation should be carried out after the civil engineering is completed. Before installation, civil engineering should cooperate to correctly reserve or pre-embed the casing.
4.When installing equipment pipes, there should be no axial twisting, and when passing through walls or floors, they should not be forcibly corrected. When PPR pipes and fittings are laid parallel to other metal pipes, there should be a certain maintenance interval. The net distance should not be less than 100mm, and the PPR pipes and fittings should be on the inside of the metal pipe.
5.When pipes pass through the floor, steel casings should be installed, the steel casing is 50mm above the ground, and waterproof measures should be taken. When pipes pass through the roof, strict waterproof measures should be taken. A fixed bracket should be provided at the front end of the intersection.
6.When PPR pipes and fittings pass through the wall, steel casings should be installed in cooperation with civil engineering. When cold water pipes pass through the wall, holes can be reserved, and the hole size is 50mm larger than the outer diameter of the pipe.
7.For pipes directly buried in the floor and walls, the pressure test and sunshade project inspection records should be completed before sealing.
Keyword:
More dynamics
Taking the responsibility of serving the society, we are committed to the research and development of new green environmental protection pipelines, and pursuing sustainable development. At the same time, we also provide perfect after-sales service and technical guidance.

Service hotline:
Tel:+8618903743397
Email: 597843128@qq.com
Address: Xigong Industrial Park, Yuzhou City, Henan Province
SAF Coolest v1.3.1.2 设置面板 GAGSE-ZGYF-JASSE-ZWQ
无数据提示
Sorry, the current column is being updated, please look forward to it!
You can view other columns or return to theHomepage